Opens in a new tab

BIM – Case Study

Building Information Modelling (BIM) enables the creation of digital models enriched with data to support the design, construction, and operation of buildings.

Case Study

Building Information Modelling for Existing Buildings

Building Information Modelling (BIM) enables the creation of digital models enriched with data to support the design, construction, and operation of buildings. By bringing information together within a single digital environment, BIM provides a reliable digital asset that can support asset management, maintenance, future upgrades, and long-term planning.
Existing buildings present unique BIM challenges, requiring accurate capture of existing conditions and coordination of information across multiple disciplines. The following project demonstrates how BSE applies BIM to create reliable digital assets that support future planning and asset management.

John Maddison Tower

  • 01

    Overview

    As part of the Department of Communities and Justice’s broader initiative to establish accurate digital models of existing assets, NSW Public Works engaged BSE to develop a comprehensive Revit model and Work-As-Executed (WAE) documentation for John Maddison Tower in Sydney.

    Located at 86-90 Goulburn Street within Sydney’s Downing Centre court precinct, the building accommodates criminal trials and sentencing matters, as well as the civil registry. As an operational building, scanning activities were undertaken outside standard operating hours to minimise disruption to occupants and court operations.

  • 02

    BIM Challenges

    Using the resulting scan data, point clouds, and 3D imagery, BSE developed a detailed 3D Revit model to a minimum Level of Development (LOD) 300, creating a comprehensive digital representation of the existing building.

    The model incorporates architectural elements, fixed joinery, and building services across the mechanical, electrical, hydraulic, fire, security, and communications disciplines, bringing critical building information together within a coordinated BIM environment.

  • 03

    Model Development and Coordination

    The scale and complexity of the building, particularly its plant rooms and basement levels featuring spiral ramps, presented challenges in documenting existing conditions.

    Architectural and building services elements were positioned precisely within a digital coordinate system, with complex elements verified using mirror ball 360 imagery linked to the point cloud. This helped ensure the Revit model accurately reflected existing building conditions.

    Additional visible services, including sprinklers, emergency exits, power outlets, and data outlets, were also documented as part of the project.

    Work-As-Executed drawings were developed directly from the coordinated Revit model, providing the client with consistent 2D documentation while maintaining a single source of information within the 3D environment.

  • 04

    Outcomes

    The resulting model and documentation provide the Department of Communities and Justice with an accurate digital representation of John Maddison Tower, supporting ongoing asset management and refurbishment planning.
    By consolidating architectural and building services information within a coordinated BIM environment, the project establishes a foundation for future BIM initiatives and the potential development of a Digital Twin. The completed model provides a reliable digital asset to support future planning, maintenance, and refurbishment works.

BIM Capability

The John Maddison Tower project demonstrates BSE’s capability in reality capture, existing conditions modelling, and the delivery of coordinated BIM documentation for complex operational facilities. By combining point cloud data, 3D imagery, and detailed Revit modelling, BSE creates reliable digital assets that support asset management, future planning, and ongoing building operations.