Opens in a new tab

BIM

BIM delivering coordinated digital models that improve buildability and project certainty.

Overview

Digital Coordination Through Building Information Modelling

Building Information Modelling (BIM) is the digital practice of creating coordinated 3D models enriched with data to support design, construction, and asset operation.

BIM is embedded in our workflow from project inception through to handover. We model all building services in Revit and use Navisworks, BIM Track, or Revizto for coordination, issue tracking, and clash management. Each project is led by a dedicated BSE BIM Leader responsible for preparing the BIM Execution Plan, setting modelling standards, and managing federated model reviews across disciplines.

Our approach enables automated clash detection, schedule integration, and model-based quantities to support accurate cost planning and program forecasting. We deliver construction and as-built models aligned with project and asset requirements, and can also provide client training and templates to ensure ongoing value beyond handover.

By reducing on-site conflict and rework, BIM shortens delivery time and improves buildability. Clients receive a reliable digital asset that supports facilities management, maintenance, procurement, and future change—making buildings easier and more cost-effective to operate throughout their lifecycle.

BIM Case Study

John Maddison Tower – Existing Asset Digital Modelling

  • 01

    Project Overview

    As part of the Department of Communities and Justice’s initiative to establish accurate digital models of existing assets, NSW Public Works engaged BSE to develop a comprehensive Revit model and Work-As-Executed (WAE) documentation for John Maddison Tower in Sydney. Scanning activities were undertaken outside standard operating hours to minimise disruption to court operations and building occupants.

  • 02

    BIM Scope

    BSE developed a detailed Revit model of the existing building to a minimum Level of Development (LOD) 300 using point cloud data and 3D imagery. The model incorporated architectural elements, fixed joinery, and building services across multiple disciplines, with WAE drawings produced directly from the coordinated model.

  • 03

    Key Challenges

    The building’s complex plant rooms and basement levels featuring spiral ramps required careful verification of existing conditions. Architectural and building services elements were positioned within a digital coordinate system, with complex areas verified using mirror ball 360 imagery linked to the point cloud. Additional visible building services were also documented as part of the model.

  • 04

    Outcomes

    The completed model provides the Department of Communities and Justice with an accurate digital representation of John Maddison Tower to support asset management and refurbishment planning. The project also establishes a foundation for future BIM initiatives and the potential development of a Digital Twin.

    This project demonstrates BSE’s capability to deliver coordinated digital models that support asset management, future planning, and the long-term operation of complex existing facilities.