Opens in a new tab

Brisbane Airport Domestic Terminal Bathroom Upgrades

Modernising passenger amenities within a live airport environment.

Client:

Cox Architecture • Built

Location:

Airport Drive, Brisbane Airport QLD

Status:

Ongoing

Sector:

Aviation

Photo Credit:

Brisbane Airport

Overview

Upgrading Passenger Facilities for a Growing Airport

BSE was engaged by Cox Architecture and Built to provide engineering design services for the Brisbane Airport Domestic Terminal Bathroom Upgrades, a program focused on increasing capacity and modernising passenger facilities throughout the terminal.

Originally opened in 1988, the Brisbane Airport Domestic Terminal continues to evolve to meet growing passenger demand and changing customer expectations. The bathroom upgrade program forms part of this ongoing investment, delivering modern, accessible, and functional facilities across the terminal.

The upgraded bathrooms draw inspiration from Brisbane’s unique character. Elements such as Brisbane tuff, inspired by the city’s cliffs, and imagery celebrating Brisbane and its surrounds are incorporated throughout the spaces. Touchless technology has been integrated throughout, including taps, flushes, soap dispensers, and hand dryers.

The upgrades also include new parent rooms featuring feeding chairs and dedicated changing spaces, alongside accessible and inclusive design features designed to improve comfort and usability for a diverse range of passengers.

Our Role

Coordinated Engineering Design Within an Operational Terminal

BSE provided mechanical, electrical, hydraulic, and fire protection engineering design services from initial design and documentation through to construction support.

A key focus of BSE’s involvement was the mechanical services design, particularly improving airflow throughout the bathrooms, which Brisbane Airport Corporation set as a measure of the project’s success. Early assessments identified low airflow from existing exhaust systems, informing the development of solutions to improve ventilation performance, user comfort, and long-term operational outcomes.

The designs also incorporated access panels to improve maintenance access, making ongoing cleaning and servicing easier while supporting the long-term operation of the facilities.

Another important consideration was making use of existing slab penetrations wherever possible. BSE developed hydraulic solutions to route services through the existing concrete waffle slab while avoiding structural ribs, while also assessing alternative pipework routes above the slab where required.

Outcomes

Modern Facilities Designed for Performance, Accessibility, and Longevity

The upgrade program is delivering modern, accessible, and efficient amenities throughout the Domestic Terminal while supporting increased passenger demand and improving the overall passenger experience.

By coordinating multiple building services disciplines within a live airport environment, BSE helped develop practical solutions that improve ventilation performance, simplify maintenance, and support the long-term operation of the facility. Bathroom upgrades will continue to be rolled out across the Domestic Terminal through to 2027.