Tangalooma Island Resort Wastewater Infrastructure Upgrade

Supporting future infrastructure upgrades within one of Queensland’s most unique resort destinations.

Client:

Tangalooma Island Resort

Location:

Moreton Island QLD

Status:

Completed

Sector:

Hospitality

Industrial

Services:

Overview

Infrastructure for a Self-Sufficient Island Community

Tangalooma Island Resort sits on the western coast of Moreton Island and is one of Queensland’s best-known tourism destinations. While its origins date back to a whaling station established in the 1950s, the resort has since become a popular destination for whale watching, dolphin feeding, helicopter rides, and experiencing the island’s natural environment.

Behind the scenes, however, Tangalooma functions much like a small city. Employing approximately 300 staff and accommodating up to 2,000 guests, the resort relies on self-sufficient infrastructure including electricity, water, waste management, and wastewater treatment systems.

The harsh coastal environment has taken its toll on elements of the existing wastewater infrastructure and, combined with the potential for future expansion of the resort, has created the need to upgrade and expand the system. To support the resort’s longer-term plans, the wastewater infrastructure is being upgraded in stages, with Stage 1 including the installation of a new Liquitek main sewage pump station incorporating significant buffer storage capacity to smooth flows to the existing wastewater treatment plant.

Our Role

Supporting Development Approval for Critical Infrastructure

BSE was engaged to provide the acoustic assessment supporting a development application to Brisbane City Council for the proposed wastewater infrastructure upgrade.

The assessment included onsite background noise monitoring, review of the potential noise levels associated with the proposed infrastructure, and evaluation of the development against the requirements of Brisbane City Council’s planning scheme.

The planning requirements were particularly important given the location, with strict noise limits applying not only to nearby residential receivers, but also to the conservation zones that are prevalent across Moreton Island.

Based on the assessment, BSE recommended materials and acoustic treatments to minimise noise emissions from the proposed infrastructure. The results demonstrated that, provided the recommended measures were implemented, the development could achieve compliance with the relevant noise requirements.

In addition to the acoustic scope, BSE managed an environmental consulting company as a sub-consultant to undertake the air quality and odour assessment for the proposed sewage pump station. The assessment found that, provided an odour control efficiency of 98% or greater is maintained, emissions from the proposed infrastructure are unlikely to cause nuisance at nearby sensitive land uses.

Outcomes

Balancing Resort Operations and Environmental Protection

Together, the acoustic and air quality assessments supported the development application and identified the measures required for the proposed infrastructure to comply with the relevant noise and odour requirements.

Tangalooma is a unique environment, with resort facilities sitting alongside world-class beaches and extensive conservation areas. The project required careful consideration of both the resort’s operational needs and the protection of its surrounding environment.

BSE is proud to have supported Tangalooma Island Resort with this important infrastructure upgrade, helping the resort prepare for future growth while protecting the unique environment that continues to attract visitors from Australia and around the world to Moreton Island.